CADDS Group completed large-scale target installation, survey control network installation, 3D laser scanning and post-processing for the fixed plant at RTIO’s Hope Downs. 

 

The CADDS Surveying team were required to complete the GPS, total station, and digital level observations over the control network. Works included control network adjustment and finalisation of coordinates in Mine Grid systems. The in-scope area resulted in over 3,000 scans being completed. CADDS issued data to RTIO as a georeferenced 3D point cloud (related to Mine Grid) in e57 file formats. 

 

CADDS invested significantly in supply the required networking and hardware (processing super-PCs, upgraded networks, physical servicer storage, etc.) to work with survey data at this scale. 

Our Leica RTC360 laser scanners captured 3D photogrammetry of the same area captured as the native point cloud data. This allowed for upload into visualisation packages allowing the end-user to switch between point cloud and photos for increased visual fidelity. 

> $ 250000

Contract approx value

  • Large-scale 3D laser scan to DGN & NWD model
  • High Precision Control Network (HPCN) coordination
  • Leica RTC Terrestrial Laser Scanners used
  • Scanning and Modelling Project Process Workflow used
  • Data delivery in multiple formats

Project Features

Projects

See All

Guarding System Solution

Recent years have seen a strong industry focus on guarding compliance, CADDS Group, through CADDS Fabrication and CADDS Mining, has

Find out more

Condition Monitoring Points

Monitoring equipment within the mining sector is integral to the effective and efficient functioning of all operations and machinery on

Find out more

Car Parks and Traffic Management

The team at CADDS Mining can provide car park design and documentation services, including traffic management plans and signage plans,

Find out more

Refurbishments, additions and extensions to crib rooms and WCs

The team at CADDS Mining are often engaged for both refurbishments or extensions to existing crib and WCs, as well

Find out more

Extension of the MEM workshop at Marandoo mine site

With the MEM (mobile equipment maintenance) workshop at Marandoo often at capacity, CADDS Mining was engaged to design a 2

Find out more

New tyre change bay at Western Turner mine site

The client working at Western Turner approached our team with plans for a new tyre change facility at the mine

Find out more

Expansion of Jimblebar Mine central facilities

Kerman Contracting approached our team at CADDS Mining with the brief of preparing the construction documentation for a large expansion

Find out more

Eliwana Village Design

CADDS Group won the contract directly with FMG for the design of a new accommodation village for FMG’s greenfield mine,

Find out more

Site Scanning Project

CADDS Group completed large-scale target installation, survey control network installation, 3D laser scanning and post-processing for the fixed plant at

Find out more

Don't miss an update

Sign up to stay connected, and stay in the know with all of CADDS Group.

This field is for validation purposes and should be left unchanged.