CADDS Group worked with all in-house services to complete the reactivation of Peninsula Palms Village in Dampier for Rio Tinto.

 

Part of the reactivation was to design a transit lounge (consisting of showers, lockers and changerooms) for residents on back-to-back arrangements. Instead of designing a new facility, after inspecting the site we proposed repurposing the old Wet Mess building, as internally it was beyond repair and would need a complete re-build.

 

Our design gutted the old building internally and created a separate male and female shower, locker and change room. We also designed an overflow room accessible by both the male and female facilities with double-sided lockable doors, which could act as an extension of either the male or female facilities as required by fluctuating user numbers.

 

This design came in under the budget for the new build and married the client’s preference of an 80/20 split of M/F facilities with the BCA requirements

> $ 1 M

Project value

Projects

See All

Guarding System Solution

Recent years have seen a strong industry focus on guarding compliance, CADDS Group, through CADDS Fabrication and CADDS Mining, has

Find out more

Condition Monitoring Points

Monitoring equipment within the mining sector is integral to the effective and efficient functioning of all operations and machinery on

Find out more

Car Parks and Traffic Management

The team at CADDS Mining can provide car park design and documentation services, including traffic management plans and signage plans,

Find out more

Refurbishments, additions and extensions to crib rooms and WCs

The team at CADDS Mining are often engaged for both refurbishments or extensions to existing crib and WCs, as well

Find out more

Extension of the MEM workshop at Marandoo mine site

With the MEM (mobile equipment maintenance) workshop at Marandoo often at capacity, CADDS Mining was engaged to design a 2

Find out more

New tyre change bay at Western Turner mine site

The client working at Western Turner approached our team with plans for a new tyre change facility at the mine

Find out more

Expansion of Jimblebar Mine central facilities

Kerman Contracting approached our team at CADDS Mining with the brief of preparing the construction documentation for a large expansion

Find out more

Eliwana Village Design

CADDS Group won the contract directly with FMG for the design of a new accommodation village for FMG’s greenfield mine,

Find out more

Site Scanning Project

CADDS Group completed large-scale target installation, survey control network installation, 3D laser scanning and post-processing for the fixed plant at

Find out more

Don't miss an update

Sign up to stay connected, and stay in the know with all of CADDS Group.

This field is for validation purposes and should be left unchanged.